jeffcharlton.aiBUILDING FORENSICS · PROFESSIONAL INTELLIGENCEWELCOME TO PARALLAX CLAIM CONTROL · BUILDING FORENSICS
Control the claim. Protect the people. Prevent avoidable escalation.
A practical insurer and loss-adjuster management view connecting claim history, property conditions, structural drying, accommodation, contamination, contractor performance and financial exposure.
WHAT THE SYSTEM ACTUALLY BRINGS TOGETHER
46 capabilities. Six connected areas of control.
Counts are derived from the capabilities already described in this public demonstration.INDIVIDUAL CLAIM-COST CONTROLS
See where the money is going. See when intervention is needed.
Representative figures from the demonstration claim; actual decisions require case-specific review.WHERE EARLIER ACTION MAY SAVE MONEY
Eight practical opportunities to limit avoidable claim costs.
These are opportunities for professional review, not promised savings or guaranteed claim outcomes.LESS CHASING · CLEARER MANAGEMENT · BETTER-FOCUSED ATTENTION
Spend less time assembling the claim position.
Operational efficiencies depend on the configured deployment, available data and agreed working arrangements.One connected claim chronology instead of fragmented updates.
Remote condition monitoring reduces reliance on routine manual chasing.
Centralised photographs, measurements and contractor evidence.
Clear risk flags direct attention to claims needing intervention.
Decision-ready briefings reduce repeated management reporting.
Shared claim visibility supports insurer, adjuster and contractor coordination.
THE MANAGEMENT PROBLEMS · THE OPERATIONAL BENEFITS
Replace fragmented updates with an accountable claim position.
DRYING CONTINUES WITHOUT VERIFIED PROGRESS
MANAGEMENT BENEFITRemote monitoring shows whether conditions improve, equipment stays active and intervention is required.
ALTERNATIVE ACCOMMODATION ROLLS ON UNCHECKED
MANAGEMENT BENEFITDaily costs, renewals and drying delays remain visible to the insurer and claim manager.
CONTAMINATION AND OCCUPANT RISKS APPEAR TOO LATE
MANAGEMENT BENEFITMould, concealed reservoirs, electrical hazards and vulnerable occupants trigger earlier review.
CONTRACTOR REPORTS DO NOT EXPLAIN THE REAL POSITION
MANAGEMENT BENEFITMeasurements, photographs and competence checks remain connected to one chronology.
RESERVES CHANGE AFTER COSTS HAVE ALREADY ESCALATED
MANAGEMENT BENEFITProjected cost, delay exposure and management actions support earlier oversight.
COMPLETION IS ACCEPTED WITHOUT ADEQUATE VERIFICATION
MANAGEMENT BENEFITDrying endpoints, contamination, occupant safety and sign-off remain reviewable.
MGMT-2026-08-22-A1
Escape of water · occupied property · 12-day claim
RED
Visible mould, suspected hidden reservoir and drying interruption.
9.2 g/kg
Specific humidity exceeds demonstration target of ≤8 g/kg.
Accommodation, out-of-pocket expense and avoidable delay.
LIVE CLAIM POSITION · EVIDENCE-LED MANAGEMENT REVIEW
Technical risk, evidence and cost in one view
£45 / dayDELAY
£155 / day
FROM FRAGMENTED CLAIM ACTIVITY TO EVIDENCE-LED INSURER CONTROL
The claim failures the system helps expose
Avoidable drying delays
Measurements, specific humidity and monitoring reveal ineffective drying or equipment shutdown.
Costs increasing without warning
Accommodation, equipment and reserve information support earlier financial review.
Contamination identified too late
Mould, odour, concealed reservoirs and vulnerability prompt technical escalation.
Evidence scattered across the claim
Photographs, walkthroughs, measurements and decisions remain connected.
Contractor competence assumed
Qualifications, scope, safety documentation and sign-off can be reviewed.
Re-occupancy without verification
Completion checks support evidence-led review before remaining risks are overlooked.
Figures and records shown are representative demonstration data from the supplied presentation. This public page is not an authenticated operational claims system and provides no access to live claims or protected insurer records. Operational deployment, authentication, integration and security controls must be implemented and validated separately.