DOP — Dual Optics Parallaxjeffcharlton.aiBUILDING FORENSICS · PROFESSIONAL INTELLIGENCE
FREETRIALAVAILABLE

WELCOME TO PARALLAX CLAIM CONTROL · BUILDING FORENSICS

Control the claim. Protect the people. Prevent avoidable escalation.

A practical insurer and loss-adjuster management view connecting claim history, property conditions, structural drying, accommodation, contamination, contractor performance and financial exposure.

Like having a claim manager watching the site 24/7.Continuous monitoring, alerts and connected evidence help your team see when attention is needed. Professional decisions remain with the responsible claim manager.
24/7 CLAIM MONITORINGFor less than your daily coffee?ASK ABOUT OUR FLEXIBLE PRICING →
MORE THAN 35 YEARS’ DAMAGE-MANAGEMENT EXPERIENCEAWARD-WINNING EXPERT WITNESS · EVIDENCE-LED DECISIONS
46IDENTIFIED CAPABILITIES
6CLAIM-MANAGEMENT AREAS
8COST-CONTROL OPPORTUNITIES
6WAYS TO REDUCE ADMINISTRATIVE EFFORT
12INTERACTIVE TOUR SECTIONS

WHAT THE SYSTEM ACTUALLY BRINGS TOGETHER

46 capabilities. Six connected areas of control.

Counts are derived from the capabilities already described in this public demonstration.

INDIVIDUAL CLAIM-COST CONTROLS

See where the money is going. See when intervention is needed.

Representative figures from the demonstration claim; actual decisions require case-specific review.

WHERE EARLIER ACTION MAY SAVE MONEY

Eight practical opportunities to limit avoidable claim costs.

These are opportunities for professional review, not promised savings or guaranteed claim outcomes.

LESS CHASING · CLEARER MANAGEMENT · BETTER-FOCUSED ATTENTION

Spend less time assembling the claim position.

Operational efficiencies depend on the configured deployment, available data and agreed working arrangements.
01

One connected claim chronology instead of fragmented updates.

02

Remote condition monitoring reduces reliance on routine manual chasing.

03

Centralised photographs, measurements and contractor evidence.

04

Clear risk flags direct attention to claims needing intervention.

05

Decision-ready briefings reduce repeated management reporting.

06

Shared claim visibility supports insurer, adjuster and contractor coordination.

THE MANAGEMENT PROBLEMS · THE OPERATIONAL BENEFITS

Replace fragmented updates with an accountable claim position.

PAIN POINT

DRYING CONTINUES WITHOUT VERIFIED PROGRESS

MANAGEMENT BENEFIT

Remote monitoring shows whether conditions improve, equipment stays active and intervention is required.

PAIN POINT

ALTERNATIVE ACCOMMODATION ROLLS ON UNCHECKED

MANAGEMENT BENEFIT

Daily costs, renewals and drying delays remain visible to the insurer and claim manager.

PAIN POINT

CONTAMINATION AND OCCUPANT RISKS APPEAR TOO LATE

MANAGEMENT BENEFIT

Mould, concealed reservoirs, electrical hazards and vulnerable occupants trigger earlier review.

PAIN POINT

CONTRACTOR REPORTS DO NOT EXPLAIN THE REAL POSITION

MANAGEMENT BENEFIT

Measurements, photographs and competence checks remain connected to one chronology.

PAIN POINT

RESERVES CHANGE AFTER COSTS HAVE ALREADY ESCALATED

MANAGEMENT BENEFIT

Projected cost, delay exposure and management actions support earlier oversight.

PAIN POINT

COMPLETION IS ACCEPTED WITHOUT ADEQUATE VERIFICATION

MANAGEMENT BENEFIT

Drying endpoints, contamination, occupant safety and sign-off remain reviewable.

Explore every feature at your own pace.Pause, resume, go back, restart or jump directly to any of the 12 guided sections.
START THE INTERACTIVE INSURER TOUR →

BUILDING FORENSICS · INSURANCE CLAIM INTELLIGENCE

Parallax Claim Control

ASK JEFF AI 24/7 ↗
● PUBLIC DEMONSTRATIONBOOK INSURER DEMO ↗
CLAIM MANAGEMENT REVIEW

MGMT-2026-08-22-A1

Escape of water · occupied property · 12-day claim

CLAIM RISK SCORE
73/100
RED

Visible mould, suspected hidden reservoir and drying interruption.

DRYING PERFORMANCE

9.2 g/kg

Specific humidity exceeds demonstration target of ≤8 g/kg.

PROJECTED CLAIM IMPACT
£2,015RESERVE £8,200 · 25%

Accommodation, out-of-pocket expense and avoidable delay.

LIVE CLAIM POSITION · EVIDENCE-LED MANAGEMENT REVIEW

Technical risk, evidence and cost in one view

73 / 100 · INTERVENE
IMMEDIATE MANAGEMENT ACTIONIncrease dehumidification and review contamination exposure
EQUIPMENT
£45 / day
DELAY
£155 / day

FROM FRAGMENTED CLAIM ACTIVITY TO EVIDENCE-LED INSURER CONTROL

The claim failures the system helps expose

01

Avoidable drying delays

Measurements, specific humidity and monitoring reveal ineffective drying or equipment shutdown.

02

Costs increasing without warning

Accommodation, equipment and reserve information support earlier financial review.

03

Contamination identified too late

Mould, odour, concealed reservoirs and vulnerability prompt technical escalation.

04

Evidence scattered across the claim

Photographs, walkthroughs, measurements and decisions remain connected.

05

Contractor competence assumed

Qualifications, scope, safety documentation and sign-off can be reviewed.

06

Re-occupancy without verification

Completion checks support evidence-led review before remaining risks are overlooked.

PUBLIC DEMONSTRATION · PROFESSIONAL SAFEGUARDS

Figures and records shown are representative demonstration data from the supplied presentation. This public page is not an authenticated operational claims system and provides no access to live claims or protected insurer records. Operational deployment, authentication, integration and security controls must be implemented and validated separately.